The Bell Creek Complex has significant potential for additional ounces to be added to resources. The land position covers a total of 32 square kilometres, much of which has yet to be aggressively explored. At Bell Creek Mine, the mineralization has been extended by approximately 400 metres below the limit of the existing resource and there is also the possibility of expanding resources along strike. At Vogel/Schumacher and Marlhill the current resources are shallow, mainly above the 400 metre and 360 metre levels, respectively. Extending resources at depth at these properties will be an objective of future drill programs. At the Wetmore property, six holes were drilled in 2010, all of which intersected structure and grade. Wetmore represents a second potential mineralized trend to the south of Bell Creek and Vogel/Schumacher which, through additional drilling, could contribute to an expanded mining and milling scenario at the Bell Creek Complex.